Phone: +86-0373-8693777
Email:615795100@qq.com
Language
English
China
Российская
Home
Product Center
Bridge crane
Gantry crane
Cantilever crane
Electric lifting platform
Crane accessories
Multi functional cross transport vehicle
Solution
Factory Metallurgy
Engineering and Construction
Production manufacturing handling
Building bridge cranes
Blog
Company News
Trade News
Customer Service
After-sale Service
Customer Review
Partners
About Us
Company Introduction
Culture
Visit the factory
Qualifications and Honors
Contact Us
Online message
Contact Information
10
2025-03
Gantry crane series working principle analysis
Gantry crane series are integrated lifting equipment consisting of gantry structures and lifting machinery.
2025-03-10
09
2024-12
Five new stations will be added, and the Jiaozuo-Luoyang high-speed railway is about to start construction.
Recently, the "Henan Provincial Ecological Environment Department's Reply on the Environmental Impact Report for the New Jiaozuo to Pingdingshan Railway" was issued. The formal approval of the project's environmental impact assessment report provides the necessary conditions for the next step of preliminary design approval, and the project's commencement is imminent.
2024-12-09
19
2025-02
The first TBM, named 'Jianghan Pioneer', for the Yinjiaobohan Project, has begun its excavation.
On February 2, with the "Jianghan Pioneer" TBM cutterhead slowly starting to rotate at the working face of the No. 8 inspection and traffic tunnel of the Bid 4 of the Yinchang-to-Hanjiang River Diversion Project, the first TBM of the Yinchang-to-Hanjiang River Diversion Project officially started excavation in Baokang County, Hubei Province, marking the project's entry into a new phase of TBM tunnel excavation.
2025-02-19
30
2024-11
Zhengzhou Metro Line 6 Phase 1 Northeast Section commences initial operation
Line 6 Phase 1 Northeast Section is an extension of Line 6 Phase 1 West Section, starting from Fengwan Station and ending at Tsinghua High School Station. The line is approximately 26.4 kilometers long with 18 underground stations. Among them, 8 stations are interchange stations, respectively interchanging with Line 1 at Yan Zhuang Station, Line 2 at Erligang Station, Line 3 at Expo Center Station, Line 4 at Tsinghua High School Station, Line 5 at Tong Huai Station and Yao Zhai Station, the under-construction Line 7 at University Middle Road Station, and the under-construction Line 8 at Xiaoying Station. After the connection and operation of Line 6 Phase 1 Northeast Section and West Section, the total length of the operating line will be approximately 43.4 kilometers.
2024-11-30
08
2024-07
The Hunan's largest diameter shield tunnel has been completed and opened to traffic
The Xiangya Road Tunnel in Changsha, Hunan Province, was completed and opened to traffic on July 5th, allowing citizens to cross the river in as little as 5 minutes. This is currently the largest diameter shield tunnel in Hunan Province and the largest tunnel project crossing the Xiangjiang River. To date, Changsha urban area has 14 cross-river channels.
2024-07-08
01
The Shenzhen-Zhongshan Channel officially opened to traffic
On June 30, the world-class cross-sea cluster project, after 7 years of arduous construction, was fully opened to traffic. The Shenzhen-Zhongshan Channel has been completed, connecting the golden inner bay. Shenzhen and Zhongshan have officially entered the "same city moment", and travel between the east and west banks of the Pearl River Estuary no longer needs to detour via the Humen Bridge, with travel time shortened to within 30 minutes.
2024-07-01
online message
Leave your contact information for free product quotes